![]() |
![]() |
![]() |
Barnham re-signalling and re-modelling |
|
![]() |
![]() |
|
Re-signalling and track re-modelling has been underway at Barnham for the past few months. This is to provide a more flexible layout for operating. These four photographs taken by Colin Scott-Morton on April 3rd 2008 illustrate various aspects of what is being done. (above left) The existing signal box on the platform at Barnham Station and in the background to the right its modern replacement, and |
|
![]() |
![]() |
|
|
||
This feature is brought to you by the Southern Electric Group as a service to its members and enthusiasts. The Southern Electric Group is the only group covering all aspects of the Southern Electric System past , present and future. If you are not a member you are very welcome to join the group. For more details please follow the links bottom left.
|
||
| Find out more about the SEG or about
membership and to print out a membership application form. |
This page updated 19th May 2008 by Colin Duff. All text, graphics and photographs are ©Copyright |
|