Mitcham Eastfields
![]() |
We now switch to looking at the down platform. Despite the yellow box hatching and frequent trains motorists still queue across the level crossing! |
![]() |
(left)
The interior of the station footbridge was still under construction even though the station had been in use for just over a month and it being two days before the station's official opening. The bridge also has lift access but the two lifts had not been commissioned when the photographs were taken. (right) The basic but stylish canopy arrangement. Note also the passenger information communicator and the new style ticket machines; the latter being unable to cope with sign-for credit cards. |
![]() |
![]() |
The down platform, looking towards the up platform. Besides the proximity of the level crossing on Eastfields Road , both the approaching signalling and the two footbridges dictated the use of staggered platforms rather than being positioned opposite each other. |
![]() |
![]() |
(far left) The DOO (driver only operation) monitors 3 & 4 on the down platform. The station has four pairs of monitors in total. (left) Painted marks on the platform coping stones delineate the point from which each DOO monitor becomes effective. This mark is for monitor no.3 on the down platform. |
FIRST FEW HOURS OF OPERATION ON 2nd JUNE
RETURN TO NEWS ARCHIVE
RETURN TO NEWS INDEX
|
|
||
This feature is brought to you by the Southern Electric Group as a service to its members and enthusiasts. The Southern Electric Group is the only group covering all aspects of the Southern Electric System past , present and future. If you are not a member you are very welcome to join the group. For more details please follow the links bottom left.
|
||
| Find out more about the SEG or about
membership and to print out a membership application form. |
This page updated 2nd August 2008 by Colin Duff. All text, graphics and photographs are ©Copyright |
|